|
|
|
|
|
|
|
|
|
|
Click on photo to |
Pioneer Elementary School |
|||
|
2101 E. Lincoln Avenue Sunnyside, WA |
||||
|
Project Description Pioneer Elementary School is a single story 72,014 square foot building. This slab-on-grade structure consists of exterior insulated CMU bearing walls with steel and wood beams. The roof is constructed of wood scissor trusses, plywood joists and open-web steel joists with wood frame interior walls. The entire building has automated fire sprinklers and is air conditioned. New asphalt parking lots, concrete curbing and sidewalks complete the exterior. |
||||
|
7511 W. Arrowhead #B = Kennewick, WA 99336 = (509) 735-3377 = project@chervenell.com |
||||
|
|
||||
|
Teamwork = Reliability = Timely = Competitive = Quality |
||||
|
|
||||