Carmichael Middle School

620 Thayer | Richland, WA 99352

Carmichael Middle School

Owner:
Architect:
Value:
Duration:
Status:
Contract Type:
CCC Starting Point:

Richland School District
SCM Consultants
$10,345,000
20 Months
Complete
Lump Sum
Post Public Bid Opening

This modernization project included remodeling of the existing 80,000 square foot structure and adding new classrooms, a library, and a new 29,000 square foot insulated tile-up concrete gymnasium.

This project was challenging due to the phasing requirements of the owner and the safety involved with children using the facility during construction. Keeping all systems operational during this period was difficult and there was an incredible amount of work needed during the first student summer break.

The facility is completely updated to today's building codes and ADA requirements. The grounds have been fully irrigated with a new parking lot to accommodate this "new" school. We completed some portions of the work several months ahead of schedule, which made this very tough job look easier than it was.

  • 29,000 sq. ft. gymnasium
  • 80,000 sq. ft. remodel