Projects > Educational
Sierra Vista Middle School
916 N 16th Street | Sunnyside, WA
Owner:
Architect:
Value:
Duration:
Status:
Contract Type:
CCC Starting Point:
Sunnyside School District
Loofburrow Architects
$11,400,000
13 Months
Complete
Lump Sum
Post Public Bid Opening
This was a two-phased project that consists of two classroom wings, offices, and a main gym in the first phase.
The second phase consists of a third classroom wing and the addition of an auxiliary gym. This project provided several challenges, one being a tight schedule.
The schedule for phase 1 was tight and this was compounded by the second phase needing to be complete at approximately the same time. Despite this challenge the project was complete in August of 2006.
- Two Phases
- Completed on Time