Jadwin Office Building

Jerry D. Abrams Company, Inc.

1060 Jadwin Avenue | Richland, WA

jadwin

Owner:
Architect:
Duration:
Status:
Contract Type:
CCC Starting Point:

Jerry D. Abrams Company, Inc.
ALD Architects
8 Months
Complete
Negotiated GMP
Conclusion of Design Phase – CCC worked closely with the Design team to value engineer this building to the owner’s needs.

The Jadwin Avenue Office Building is a 32,000 square foot office building with many extra amenities.

The project included a 7,000 square foot full basement and three-stories above grade. The basement includes tenant storage units and mechanical systems. Three floors are set up for tenant improvements, with fully-finished restrooms and corridors. A conference room was built on the second floor for tenant use.

The building finishes include granite floors, cherry-stained birch wood paneling, and matching doors and window re-lites. The elevator features bronze finishes and a window along the back wall facing out to the lobby of the building. The exterior of the building is brick with the 2nd and 3rd floors incorporating full-height glass curtain walls with bronze glass.

In addition to the shell and core work on the project, Chervenell also complete a Tenant Improvement for Community First Bank including a drive-through ATM covered canopy, teller window and two additional office suites.

  • 32,000 sq. ft.